City of Coral Gables

File #: 18-7870    Version: 1 Name: TPO Grant Acceptance
Type: Resolution Status: Adopted
File created: 9/5/2018 In control: City Commission
On agenda: 9/11/2018 Final action: 9/11/2018
Enactment date: 9/11/2018 Enactment #: 2018-240
Title: A Resolution accepting Miami-Dade County Transportation Planning Organization (TPO) Smart grant funds for the pedestrian and bike network level of stress assessment study.
Attachments: 1. SMART grant-COVER, 2. SMART grant RESOL, 3. Grant Application, 4. Consultant Proposal, 5. 2018-240, 6. Verbatim Transcript - CCMtg September 11 2018 - Agenda Item D-3 - Reso accepting MDC Transportation Planning Organization Smart grant funds

Title

A Resolution accepting Miami-Dade County Transportation Planning Organization (TPO) Smart grant funds for the pedestrian and bike network level of stress assessment study.

Body

The Department of Public Works was awarded an eighty thousand dollar ($80,000) planning grant by the Transportation Planning Organization to complete a Pedestrian & Bike Network Level of Stress Assessment Study.  The grant requires a local match of twenty thousand dollars ($20,000).

 

The proposed stress assessment study will support the 2014 Commission adopted Bicycle and Pedestrian Master Plan by assessing qualitative aspects of the City’s existing and future bike network while also providing valuable pedestrian safety assessments.  Measuring the comfort and experience of cycling and walking will help create a safer, low-stress network which attracts users of all ages and abilities.  The study will analyze Coral Gables’ entire active mobility network and reference the Highway Capacity Manual’s assessment guidelines, as well as similar stress-level studies completed in other cities, to determine the quality, level of service, and stress level of the pedestrian and bicycle network. The study will also reference the National Association of City Transportation Officials (NACTO) latest design standards to serve as a benchmark in determining possible improvements which could be incorporated into Coral Gables’ active mobility network.

active mobility network.

 

Project Schedule - 6 months total

Task

Length

Data Collection

2 months

Analysis

1 month

Draft of recommendations/findings

1 month

Multi-agency review and comments

1 month

Public comment period/Final draft

1 month