City of Coral Gables

File #: 21-2299    Version: 1 Name: 5221 Orduna - Outside Sewer Connection
Type: Resolution Status: Adopted
File created: 4/19/2021 In control: City Commission
On agenda: 5/11/2021 Final action: 5/11/2021
Enactment date: 5/11/2021 Enactment #: 2021-73
Title: A Resolution of the City Commission authorizing the execution of an agreement for sewer connection for property located outside the city’s sewer district at 5221 Orduna Drive, Coral Gables, Florida to the City of Coral Gables’ wastewater collection / transmission system, subject to the requirements of the Public Works Department as provided under Chapters 62 and 78 of the City Code, Ordinance No. 2007-29 and 2009-39 and Resolution No. 2008-07; and provided that the executed agreement be made part of this resolution.
Attachments: 1. Signed Resolution 2021-73, 2. Casa Orduna outside sewer connection - COVER 05 2021, 3. Casa Orduna outside sewer connection - RESOL 05 2021, 4. Letter of Agreement, 5. city code 78-106, 6. Ordinance No. 2007-29, 7. Ordinance No. 2009-39, 8. Resolution No. 2008-07
Title
A Resolution of the City Commission authorizing the execution of an agreement for sewer connection for property located outside the city’s sewer district at 5221 Orduna Drive, Coral Gables, Florida to the City of Coral Gables’ wastewater collection / transmission system, subject to the requirements of the Public Works Department as provided under Chapters 62 and 78 of the City Code, Ordinance No. 2007-29 and 2009-39 and Resolution No. 2008-07; and provided that the executed agreement be made part of this resolution.
Body
Property Owner, 5221 Orduna Drive Holdings LLC is requesting authorization for an outside sewer connection to the City Sanitary Sewer district to serve a proposed Multi-Family Building (5) Units within the property. The project is located at 5221 Orduna Drive, Coral Gables, Florida and it shall be subject to the requirements of the Public Work Department, as set forth in Chapters 62 and 78 of the City Code, Ordinance No. 2007-29, and No. 2009-39 and Resolution No. 2008-07.

The property is located outside City’s sewer service area and a new private sewer pump station will be installed to serve the project; the project will be connected by a new proposed 4” force main to be owned and maintained by the City of the Coral Gables. The proposed daily peak flow has been estimated to be 3,434 Gallons per day (GPD). As per Miami-Dade Department of Regulatory and Economic Resources (RER), all downstream pump stations including the treatment plant have capacity at this time. Flows from this project will connect through the existing City’s 24-in force main located at the intersection of Granada Avenue and Ponce de Leon Boulevard.

The request consists of a sewer extension for a proposed private pump station system discharging through a proposed new 4-in force main line connecting into City’s force main system.

The property Owner agrees to comply with the terms outlined in Ordinance Nos. 2007-29 and 2009-39 (City Code Section 78-106), and Resolut...

Click here for full text