Title
A Resolution of the City Commission authorizing the execution of an agreement for sewer connection for property located outside the City’s sewer district at 4880 Hammock Lake Drive, Coral Gables, Florida into the City of Coral Gables wastewater collection / transmission system, subject to the requirements of the Public Works Department, as provided under Chapters 62 and 78 of the City Code, Ordinance Nos. 2007-29 and 2009-39 and Resolution No. 2008-07; and provided that the executed agreement be made part of this resolution.
Body
Carlab, Inc. Engineering, on behalf of property Owners/Applicants, Cesar Molina and Shana Willinsky, are requesting authorization for an outside sewer connection into the City’s sanitary sewer district.  The property is located at 4880 Hammock Lake Drive, Coral Gables, and shall be subject to the requirements of the Public Work Department, as set forth in Chapter 62 and 78 of the City Code, Ordinance No. 2007-29, and No. 2009-39 and Resolution No. 2008-07.  
The property will be connected into the Solano Prado 1 basin service area discharging into Miami-Dade Water and Sewer Department.  As per Miami-Dade Department of Regulatory and Economic Resources (RER), the receiving pump station has sufficient capacity for the proposed project and all downstream pump stations, including the treatment plant, have capacity, at this time.  
The property Owners agree to comply with the terms outlined in Ordinance Nos. 2007-29 and 2009-39 (City Code Section 78-106), and Resolution No. 2008-07 and enter into an agreement, according to Carlab, Inc. Engineering’s Letter of Agreement to be approved by the City Attorney’s Office. 
Concurrently, upon signing the agreement, the property Owners agree to pay the City of Coral Gables a connection fee based on the estimated daily peak flow.  The estimated daily peak flow was estimated based on the proposed additional average flows of 510 GPD with a peak factor demand of 4.44 (per Ten State Standard).  Fo...
Click here for full text