File #: 25-8782    Version: 1 Name: 950 University Dr - Outside Sewer Connection
Type: Resolution Status: Adopted
File created: 3/6/2025 In control: City Commission
On agenda: 3/11/2025 Final action: 3/11/2025
Enactment date: 3/11/2025 Enactment #: 2025-62
Title: A Resolution of the City Commission authorizing the execution of an agreement for sewer connection for property located outside the City’s sewer district at 950 University Dr, Coral Gables, Florida into the City of Coral Gables wastewater collection / transmission system, subject to the requirements of the Public Works Department, as provided under Chapters 62 and 78 of the City Code, Ordinance Nos. 2007-29 and 2009-39 and Resolution No. 2008-07; and provided that the executed agreement be made part of this resolution.
Attachments: 1. R-2025-62-Signed, 2. 950 University Dr, -Outside Sewer Connection- COVER, 3. 950 University Dr, -Outside Sewer Connection- RESOL, 4. Granada Church - Letter of Agreement, 5. City Code 78-106, 6. Ordinance No. 2007-29, 7. Ordinance No. 2009-39, 8. Resolution No. 2008-07
Title
A Resolution of the City Commission authorizing the execution of an agreement for sewer connection for property located outside the City’s sewer district at 950 University Dr, Coral Gables, Florida into the City of Coral Gables wastewater collection / transmission system, subject to the requirements of the Public Works Department, as provided under Chapters 62 and 78 of the City Code, Ordinance Nos. 2007-29 and 2009-39 and Resolution No. 2008-07; and provided that the executed agreement be made part of this resolution.

Body
The property will be connected into the City’s sanitary sewer service area discharging into pump station PS-4. As per Miami-Dade Department of Regulatory and Economic Resources (RER), the receiving pump station has sufficient capacity for the proposed project and all downstream pump stations, including the treatment plant, have capacity, at this time.

The property Owner agrees to comply with the terms outlined in Ordinance Nos. 2007-29 and 2009-39 (City Code Section 78-106), and Resolution No. 2008-07 and enter into an agreement, as per Compeling Solutions, Inc.’s Letter of Agreement dated December 13, 2024, to be approved by the City Attorney.

Concurrently, upon signing the agreement, the property Owner agrees to pay the City of Coral Gables a connection fee based on the estimated daily peak flow. The estimated daily peak flow was estimated based on the proposed additional average flows of 3,961 GPD and a peak factor demand of 4.33 (per Ten State Standard). For an estimated peak flow demand of 17,349 GPD. The fee has been estimated to be $36,017.37.

The property Owner shall provide a Maintenance or other Surety Bond in the amount of five percent (5%) of the construction cost to assure timely repairs of the property Owner’s facilities, should a failure occur. Said Bond is to run in perpetuity or until connection is no longer required.
The property Owner shall provide Liability Insurance in the amounts required by Resolution No....