Title
134 FLORIDA AVENUE (HISTORIC PROPERTY)
(Owner requested second administrative hearing due to issuance of a notice of intent to lien dated to 07/03/2026 ).
(This case entered into an agreed order with the city which was approved by the Board on the 04/15/2026 hearing. This agreed order also included three other cases regarding the same property. This Agreed Order granted the owner 60 days to both apply and obtain all necessary permits and a total of 240 days from the date of the order to bring all violations covered into full compliance expiring on December 11th, 2026, including closing of said permits. In the event of non-compliance with any of the deadlines stipulated by the order, a fine of $150.00 will accrue every day that non-compliance continues).
Violation Description - Floors, walls, ceilings and roofs - Sec. 105-278. - Floors, walls, ceilings and roofs. Floors, walls, ceilings and roofs of every structure used for human habitation shall be structurally sound, and maintained in a clean and sanitary condition. They shall be free from cracks, breaks, loose plaster and similar conditions so serious as to endanger the safety of occupants or to seriously mar the attractiveness of the premises. (Code 1958, § 16A-36; Code 1991, § 12-178; Code 2006, § 105-289; Ord. No. 1142, § 4.5, 7-14-1959; Ord. No. 2013-07, § 2, 5-28-2013).
Code Enforcement Officer Comments - Apply for, obtain, and pass final inspection on all required after-the-fact development approvals, including, but not limited to, building permits, to legalize or remove all work done without a permit, as applicable and Clean, repair, and maintain the structure on the property and apply for, obtain, and pass final inspection all required development approvals, including, but not limited to, building permits, to repair and maintain the structure; including, but not limited to, any required color palette approval to paint the structures.
Remedy - Apply for, obtain, and pass final inspection on ...
Click here for full text